NYC DOB record · M01391029-I1

44 Market Street

44 Market Street, Manhattan, NY 10002

Alteration filing in Chinatown-Two Bridges, Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Nov 20, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01391029-I1

44 Market Street

Manhattan, NY 10002

Alteration filing · status dated Nov 18, 2026

Current record
Approved
Proposed scale
13 stories
Dwelling units
16
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01391029-I1 as a alteration filing at 44 Market Street, Manhattan, NY 10002. Its latest published status category is Approved, dated Nov 18, 2026. The filing records 13 proposed stories and 16 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Nov 18, 2026
Proposed scale
13 proposed stories and 16 proposed dwelling units
The building, not the filingopen housing violations, what it sold for, apartment sizes and every filing at BIN 1087489Applicant of recordSee the 95 filings that name Mj Engineering & Design
FiledApr 22, 2026
Current recordApproved
Proposed scale13 stories
Recorded cost$600,000

What the filing says

A public-record reading of the proposed work.

EXTERIOR FACADES REPAIR RELATED TO LOCAL LAW 11. The work included: 1-Replace brick masonry 2-Install masonry anchors at cavity wall 3-Install new shelf angles 4-Replace sealant 5-Install new vertical expansion joint 6-Repoint brick masonry.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 12-story condominium built in 2004, with 16 homes, on a 4,400 sq ft lot.

Built
2004
Floors
12
Residential units
16
Building type
Condominium
Land use
Mixed residential and commercial
Zoning district
R7-2
Lot area
4,400 sq ft
Building area
16,996 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 20, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 6 open notices on record for this building, out of 26 notices on file; the most recent was issued May 5, 2025.

  • Construction

    Issued May 5, 2025 — PARTIAL VACATE ORDER ON AN UNSAFE FISP REPORT FILED FOR 44 MARKET ST AS OBSERVATION OF CRACKED & LOOSE TILES @ ALL BALCONIES @ EAST & EAST ELEVATIONS. UNSECURED SETBACK @ WEST & EAST ELEVS. CONDITIONS HAVE MADE ENTIRE FACADE BALCONIES UNABLE TO BE OCCUPIED. REMEDY:VACATE ENTI SETBACK & EAST & WEST ELEVATIONS

  • No report and / or late filing (facade)

    Issued Feb 22, 2022 — FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022

  • Fail to certify class

    Issued May 12, 2021 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION

  • 3 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 20, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01391029-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 23 days of being filed and a quarter take longer than 4 months, measured across 99,111 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01391029-I1
BBL
1002747503
Review type
Standard Plan Examination
Existing stories
13
Proposed stories
13
Existing dwelling units
16
Proposed dwelling units
16
General constructionStructural work