What the filing says
A public-record reading of the proposed work.
Garage repairs on the cellar floor as shown on the drawings filed herewith. No change in use, egress, or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 7-story condominium built in 1920, with 64 homes, on a 18,044 sq ft lot.
- Built
- 1920
- Last altered
- 1983
- Floors
- 7
- Residential units
- 64
- Building type
- Condominium
- Land use
- Mixed residential and commercial
- Zoning district
- R8A
- Lot area
- 18,044 sq ft
- Building area
- 94,593 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 29, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 5 open notices on record for this building, out of 22 notices on file; the most recent was issued May 16, 2024.
- Construction
Issued May 16, 2024 — EMERGENCY WORK ORDER DUE TO DETERIORATED AND DAMAGED BRICK.SPALLING BR ICK FALL AND MORTAR JOINTS AT EXP1 WEST ELEV AND EXP4 SOUTH ELEV AS I OBSERVED LOOSE BRICK.REMEDY:IMMEDIATELY PROVIDE SAFETY MEASURES AND RE PAIR UNSAFE FACADE AS PER 1RNCY 103.04
- Elevator
Issued Feb 22, 2019
- (other bldgs types) - elevator affirmation of
Issued Jan 26, 2018 — VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
2 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 28, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01388827-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 75,295 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01388827-I1
- BBL
- 1009037501
- Postal code
- 10010 · 462 filings
- Review type
- Standard Plan Examination
- Existing stories
- 7
- Proposed stories
- 7
- Existing dwelling units
- 64
- Proposed dwelling units
- 64








