What the filing says
A public-record reading of the proposed work.
Renovate roof bulkhead and perform remedial work to strengthen the north wall renovated under application 122760333. Updated plans filed herewith.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 4-story walk-up apartment building built in 1900, with 20 homes, on a 2,232 sq ft lot.
- Built
- 1900
- Last altered
- 1988
- Floors
- 4
- Residential units
- 20
- Building type
- Walk-up apartment building
- Land use
- Mixed residential and commercial
- Zoning district
- R7A
- Lot area
- 2,232 sq ft
- Building area
- 6,432 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 17, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 37 open notices on record for this building, out of 43 notices on file; the most recent was issued Nov 14, 2025.
- Low pressure boiler
Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
- Construction
Issued Aug 8, 2025 — STUCT PEER REVIEW:EXP2 WALL ADJ NY NYC PARKS PROP HAS OUTER WYTHE REMOVED&INADEQUATELY REPLACED.VARIOUS STRUCT DEFECTS THROUGHOUT IN&EXT NOTED IN FEU VIOLATIONS.IMMED COMPLY W/COMMISSIONER'S ORDER #342064, VIOLATION 042425FEU10301FF DATED APRIL 24, 2025
- Construction
Issued Apr 24, 2025 — STRUCT PEER REVIEW:EXP2 WALL ADJ NY NYC PARKS PROP HAD OUTER WYTHE REMOVED&INADEQUATELY REPLACED.VARIOUS STRUCT DEFECTS THROUGHOUT INT& EXT NOTED IN FEU VIOLATIONS.ONWER TO PROVIDE NAMES OF(3)REPUTABLE NYSPE'S W/KNOWLEDGE &EXPERIENCE REPAIRING SIMILAR STRUCT BY MAY 9 2025
34 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 16, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M08025026-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Sign-off date recorded04
DOB lists a sign-off date for this filing.
- Current status updated05
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,798 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M08025026-I1
- BBL
- 1003950007
- Postal code
- 10009 · 148 filings
- Review type
- Standard Plan Examination
- Existing stories
- 4
- Proposed stories
- 4
- Existing dwelling units
- 14
- Proposed dwelling units
- 14








