What the filing says
A public-record reading of the proposed work.
Filing for installation of relieving wall @ exposure 3, per plans, in-conjunction with full demo # m01394290-i1 (immediate emergency declaration)
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story mainly residential with some commercial built in 1860, with 3 homes, on a 851 sq ft lot.
- Built
- 1860
- Last altered
- 1999
- Floors
- 6
- Residential units
- 3
- Building type
- Mainly residential with some commercial
- Land use
- Mixed residential and commercial
- Zoning district
- R8A
- Lot area
- 851 sq ft
- Building area
- 3,330 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 12, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 43 open notices on record for this building, out of 50 notices on file; the most recent was issued Apr 14, 2026.
- Immediate
Issued Apr 14, 2026 — REMEDY: FULLY DEMOLISH THE BUILDING. GRADE AND FENCE SITE. COORDINATE
- Immediate
Issued Apr 14, 2026 — REMEDY: INSTALL A TIGHT BOARD FENCE STARTING AT THE EXP 1/4 CORNER OF THE BUILDING, EXTENDING APPROX 20 FT OUT.TO THE CURB LINE, EXTENDING A APPROX 65 FT TO THE STREET CORNER OF 7 AVE AND W. 22 ST,EXTENDING APPROX 55 FT.ALONG THE PARKING LANE OF W. 22 ST, APPROX 8 FT BACK TO CURB LINE AND 15 FT BACK TO THE EXP 2/3 CORNER OF THE.BUILDING TO SEC+
- Immediate
Issued Apr 14, 2026 — REMEDY: FULLY DEMOLISH THE BUILDING. GRADE AND FENCE SITE. COORDINATE ALL WORK WITH FDNY (DIV 01:212-570-4365; MN DISPATCH: 212-570-4261) AND FIRE MARSHAL (718-281-8402; 917-701-8164)
40 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 12, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01420994-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 79,351 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01420994-I1
- BIN
- 1014126
- BBL
- 1007720044
- Postal code
- 10011 · 762 filings
- Review type
- Professional Certification
- Existing stories
- 6
- Proposed stories
- 6
- Existing dwelling units
- 3
- Proposed dwelling units
- 3








