What the filing says
A public-record reading of the proposed work.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the NYC building code. no change in use, occupancy, or egress under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story elevator apartment building built in 1940, with 148 homes, on a 48,000 sq ft lot.
- Built
- 1940
- Last altered
- 2016
- Floors
- 6
- Residential units
- 148
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R7-1
- Lot area
- 48,000 sq ft
- Building area
- 144,354 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 17, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 147 notices on file; the most recent was issued Jan 8, 2025.
- Fail to certify class
Issued Jan 8, 2025 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
- Construction
Issued Aug 15, 2024 — EMERGENCY WORK ORDER DUE TO IMMINENT HAZARDOUS CONDITIONS OBSERVED ON ALL FOUR EXPOSURES.I OBSERVED CRACKS AND SPALLING MORTAR JOINTS,MULTIP LE CORRODED SAGGING METAL LINTELS ON SEVERAL FLOORS.CRACKS,MISSING BRI CKS,ERODED BRICKS AT PARAPET AND SPANDRELS.AC INADEQUATELY SUPPORTED.R EMEDY:OWNER MUST RETAIN A LIC PE TO FILE FISP REPORT WITH DOB
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 17, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X01098859-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 82,285 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X01098859-I1
- BIN
- 2093291
- BBL
- 2042920014
- Postal code
- 10462 · 248 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 148
- Proposed dwelling units
- 148