What the filing says
A public-record reading of the proposed work.
Heavyduty sidewalk shed as per plans for exterior repairs. no change in use occupancy or egress under this application. sidewalk shed shall comply with chapter 33 of the 2022 NYC building code.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 4-story walk-up apartment building built in 1931, with 24 homes, on a 5,772 sq ft lot.
- Built
- 1931
- Floors
- 4
- Residential units
- 24
- Building type
- Walk-up apartment building
- Land use
- Walk-up apartments
- Zoning district
- R5
- Lot area
- 5,772 sq ft
- Building area
- 16,468 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 17, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 2 notices on file; the most recent was issued Apr 16, 2025.
- Construction
Issued Apr 16, 2025 — REQUESTING AN ENGINEER REPORT DUE TO PARAPET WALL AT EXPOSURE #1 LEFT SIDE OF BUILDING LEANING INWARDS TOWARDS PROPERTY. ALSO OBSERVED CRACKS ON PARAPET WALL. AN ENGINEERING REPORT IS REQUIRED TO ASSESS THE STABILITY OF PARAPET WALL AT EXPOSURE#1.
- Construction
Issued Apr 4, 2008
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 17, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B01459897-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 63,690 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B01459897-I1
- BIN
- 3133680
- BBL
- 3055500012
- Postal code
- 11204 · 1845 filings
- Review type
- Professional Certification
- Existing stories
- 4
- Proposed stories
- 4
- Existing dwelling units
- 23
- Proposed dwelling units
- 0