What the filing says
A public-record reading of the proposed work.
Erect temporary plywood construction fence in conjunction with new building
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a vacant land on a 2,500 sq ft lot.
- Residential units
- 0
- Building type
- Vacant land
- Land use
- Vacant land
- Zoning district
- R5B
- Lot area
- 2,500 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 21, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 12 open notices on record for this building, out of 18 notices on file; the most recent was issued Dec 10, 2024.
- Construction
Issued Dec 10, 2024 — BGM ENGNRNG, EOR RQSTD MONTHLY OPTICAL MONITORING OF SITE & ADJOINING BLDGS @ END OF EMERGENCY WRK. REMEDY: RETAIN NYS SURVEYOR 2 PERFORM MONTHLY MONITORNG & SUBMT RPTS 2 DOB. SUBMIT UPDATED RPT BY 12/17/24 & @ 4 WKS THEREAFTER
- Construction
Issued Feb 14, 2024 — BGM ENGNRNG, EOR RQSTD MONTHLY OPTICAL MONITORING OF SITE &ADJ BLDGS @ END OF EMERGENCY WRK REMEDY: RETAIN NYS SURVEYOR TO PERFORM MONTHLY MONITORING & SUBMT RPTS TO DOB. 1ST RPT BY 2/19/24 & @ 4 WKS THEREAFTER
- Construction
Issued Nov 21, 2023 — PEER REVIEW OF ALL SOE/UNDERPINNING/SUBGRAGE IMPROVEMENT/PERMEANT.FDN SYSTEMS FILED UNDER ALL RELEVANT APPLICATIONS. REMEDY: COMPLY WITH PREVIOUS DOB ORDER. SUBMIT PEER REVIEW REPORT BY 12/21/23
9 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00054777-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 71,086 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00054777-I1
- BIN
- 3428836
- BBL
- 3039570001
- Postal code
- 11208 · 1622 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- Empty in the source
- Proposed dwelling units
- Empty in the source