What the filing says
A public-record reading of the proposed work.
Removing deteriorated conrinces from roof exposure #1 and #2 to correct the ecb violation #39169972l and DOB violations 050223cfeu30501zt and 060123cfeu30502zt. no change in egress, use and occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 3-story place of worship built in 1925, on a 1,407 sq ft lot.
- Built
- 1925
- Floors
- 3
- Residential units
- 2
- Building type
- Place of worship
- Land use
- Public facilities and institutions
- Zoning district
- R5
- Lot area
- 1,407 sq ft
- Building area
- 3,000 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 12, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 11 open notices on record for this building, out of 13 notices on file; the most recent was issued Dec 16, 2025.
- Immediate
Issued Dec 16, 2025 — REMEDY: INSTALL APPROXIMATELY 65 LF OF SIDEWALK SHED ALONG EXPOSURE 2 (BELMONT AVENUE) WITH A WRAP-AROUND INTO EXPOSURE #1 APPROXIMATELY 30 LF. SIDEWALK SHED SHOULD BE INSTALLED AGAINST THE BUILDING AND ACCOUNT FOR CORNER VOID AND REQUIRED 5'FT EXT AT BOTH ENDS FOR A TOTAL OF 95LF TO PROTECT THE PUBLIC
- Low pressure boiler
Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
- Construction
Issued Jun 1, 2023 — FTM.FEU OBSRVD 1.THE CORNICE APPEARD TO BE RUSTD&DTERIORATD ALONG EXP1 &EXP2,2.THE DECORATIVE STEEL PANEL ALONG EXP1&EXP2 APPEARD TO BE RUSTD &NOT FULLY SERVD TO FACADE,3.SOME BRCKS HAD CRCKD@EXP2.IMMEDIATELY COMPLY WITH THE COMMISSIONER'S ORDER #341353(050223FEU30501ZT)TO REPAIR THE BUILDING UNDER PERMIT
8 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 12, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B01408448-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 79,351 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B01408448-I1
- BIN
- 3089273
- BBL
- 3040190133
- Postal code
- 11208 · 1688 filings
- Review type
- Standard Plan Examination
- Existing stories
- 3
- Proposed stories
- 3
- Existing dwelling units
- 2
- Proposed dwelling units
- 2








