What the filing says
A public-record reading of the proposed work.
SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo building underpinning. Repair and strengthen existing foundation walls and columns, with inclusion of mini piles.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 4-story mainly residential with some commercial built in 1900, with 6 homes, on a 1,971 sq ft lot.
- Built
- 1900
- Last altered
- 1984
- Floors
- 4
- Residential units
- 6
- Building type
- Mainly residential with some commercial
- Land use
- Mixed residential and commercial
- Zoning district
- R9A
- Lot area
- 1,971 sq ft
- Building area
- 5,616 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 2, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 4 open notices on record for this building, out of 4 notices on file; the most recent was issued May 15, 2014.
- Low pressure boiler
Issued May 15, 2014 — VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
- Local law 62/91 - boilers
Issued Aug 29, 1995
- Local law 62/91 - boilers
Issued Mar 18, 1994
1 further open notice is on file. Open the source dataset for the full list.
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M00908750-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M00908750-I1
- BIN
- 1052442
- BBL
- 1016590026
- Postal code
- 10029 · 158 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 6
- Proposed dwelling units
- 6