NYC DOB record · M01370434-I1

2145 2 Avenue

2145 2 Avenue, Manhattan, NY 10029

Alteration filing in East Harlem (North), Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 1, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01370434-I1

2145 2 Avenue

Manhattan, NY 10029

Alteration filing · status dated Sep 28, 2026

Current record
Approved
Proposed scale
5 stories
Dwelling units
8
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01370434-I1 as a alteration filing at 2145 2 Avenue, Manhattan, NY 10029. Its latest published status category is Approved, dated Sep 28, 2026. The filing records 5 proposed stories and 8 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Sep 28, 2026
Proposed scale
5 proposed stories and 8 proposed dwelling units
Applicant of recordSee the 5 filings that name Kieran Patrick Spillane
FiledMay 26, 2026
Current recordApproved
Proposed scale5 stories
Recorded cost$30,745

What the filing says

A public-record reading of the proposed work.

SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo cellar door alteration & vault removal. Replacement of existing entrance with new reinforced concrete walls, and slab for new cellar hatch with vertical ladder.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 5-story walk-up apartment building built in 1910, with 8 homes, on a 1,894 sq ft lot.

Built
1910
Floors
5
Residential units
8
Building type
Walk-up apartment building
Land use
Mixed residential and commercial
Zoning district
R9A
Lot area
1,894 sq ft
Building area
7,375 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 1, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01370434-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01370434-I1
BIN
1052467
BBL
1016600023
Review type
Standard Plan Examination
Existing stories
5
Proposed stories
5
Existing dwelling units
8
Proposed dwelling units
8
General constructionFoundation workEarthwork