What the filing says
A public-record reading of the proposed work.
Herewith filing for facade repairs and parapet wall replacement work as per plans. no change to use, egress or occupancy under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 4-story walk-up apartment building built in 1925, with 30 homes, on a 6,633 sq ft lot.
- Built
- 1925
- Floors
- 4
- Residential units
- 30
- Building type
- Walk-up apartment building
- Land use
- Walk-up apartments
- Zoning district
- R6A
- Lot area
- 6,633 sq ft
- Building area
- 23,760 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 17, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 14 notices on file; the most recent was issued Jun 5, 2025.
- Construction
Issued Jun 5, 2025 — FTC W/COMMISSIONER'S ORDER CONTROL#342015 & VIO#040825PI31401SB DATED 04/08/2025 REQUIRING OWNER TO SUBMIT A CORRECTIVE ACTION PLAN W/IN 30 DAYS FROM DATE OF PI INSP AS OF TODAY 06/05/25 A CORRECTIVE ACTION PLAN WAS NOT REC'D. IMMED COMPLY W/COMMISSIONER'S ORDER CONTROL#342015 &VIO#040825PI30401SB TO SUMBIT CORRECTIVE ACTION PLAN
- Construction
Issued Apr 8, 2025 — CORRECTIVE ACTION PLAN REQ'F. OBSERV AT MULTIPLE LOCATIONS CRACKED/SPALLING MASONRY, DETERIORATED MORTAR JOINTS, AND CRACKED WINDOW SILLS. REMEDY: OWNER TO IMMED RETAIN REG DESIGN PROF TO EVAL THE ENTIRE BUILDING AND SUBMIT CORRECTIVE ACTION PLAN TO PROACTIVEINSP @BUILDINGS.NYC.GOV WITHIN 30 DAYS ADDRESSING ALL CONDITIONS
- Local law 62/91 - boilers
Issued Aug 16, 1993
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 17, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B01266442-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 82,285 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B01266442-I1
- BIN
- 3118871
- BBL
- 3051650015
- Postal code
- 11226 · 2461 filings
- Review type
- Standard Plan Examination
- Existing stories
- 4
- Proposed stories
- 4
- Existing dwelling units
- 30
- Proposed dwelling units
- 30