NYC DOB record · M01230005-S1

215 West 98 Street

215 West 98 Street, Manhattan, NY 10025

Alteration filing in Upper West Side-Manhattan Valley, Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Nov 21, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01230005-S1

215 West 98 Street

Manhattan, NY 10025

Alteration filing · status dated Nov 18, 2026

Current record
Approved
Proposed scale
12 stories
Dwelling units
72
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01230005-S1 as a alteration filing at 215 West 98 Street, Manhattan, NY 10025. Its latest published status category is Approved, dated Nov 18, 2026. The filing records 12 proposed stories and 72 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Nov 18, 2026
Proposed scale
12 proposed stories and 72 proposed dwelling units
The building, not the filingopen housing violations, what it sold for, apartment sizes and every filing at BIN 1082691Applicant of recordSee the 24 filings that name Mark Gould Architect
FiledMay 29, 2025
Current recordApproved
Proposed scale12 stories
Recorded cost$30,000

What the filing says

A public-record reading of the proposed work.

5c: installation of plumbing fixtures as per plans filed herewith. no change to use, egress or occupancy

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 12-story condominium built in 1911, with 96 homes, on a 19,710 sq ft lot.

Built
1911
Floors
12
Residential units
96
Building type
Condominium
Land use
Mixed residential and commercial
Zoning district
R9A
Lot area
19,710 sq ft
Building area
150,289 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 21, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 7 open notices on record for this building, out of 41 notices on file; the most recent was issued Jun 26, 2024.

  • Fail to certify class

    Issued Jun 26, 2024 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION

  • Construction

    Issued Nov 10, 2021 — FAILURE TO COMPLY WITH COMMISSIONER'S ORDER 322185(2320LL10702OS) IISUED ON 02/03/2020. AS OF 11/10/2021 OWNER HAS NOT COMPLIED WITH IMMEDIATE CURE ORDER. REMEDY: IMMED COMPLY WITH CODE AND COMMISSIONERS ORDERS

  • Construction

    Issued Jun 9, 2021 — FAILURE TO COMPLY. ON 09/17/2020 COMMISSIONER'S ORDER 349463 (091720CLLFA01RF)WAS ISSUED TO OWNER TO HAVE ENTIRE CORNICE 100% INSPECTED BY A NYS LIC PROF ENG'R. AS OF 06/09/2021 OWNER HAS NOT COMPLIED W/IMMED CURE ORDER TO HAVE ENTIRE CORNICE INSPECTED & PROVIDE REPORT & REPAIR PROPOSAL & PERMIT. REMEDY:IMMED COMPLY W/COMM ORDER

  • 4 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 20, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01230005-S1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 23 days of being filed and a quarter take longer than 4 months, measured across 99,692 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01230005-S1
BBL
1018707502
Review type
Standard Plan Examination
Existing stories
12
Proposed stories
12
Existing dwelling units
72
Proposed dwelling units
72