What the filing says
A public-record reading of the proposed work.
Repair of front and rear facades, repair work on roof, no change in use, occupancy, or egress. No work in the interior.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story elevator apartment building built in 1960, with 54 homes, on a 4,938 sq ft lot.
- Built
- 1960
- Last altered
- 1975
- Floors
- 6
- Residential units
- 54
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R8B
- Lot area
- 4,938 sq ft
- Building area
- 24,600 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 10, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 35 open notices on record for this building, out of 58 notices on file; the most recent was issued Aug 13, 2026.
- Construction
Issued Aug 13, 2026 — FAILURE TO MAINTAIN BLDG WALL & APPURTANCES. SPALLED/CRACKED MASONRY BRICKS MULTI LOCS OF PARAPET LVL,OPEN/REMOVED LINTEL BRICKS WITH WOOD BRACING INSTALL IN PLACE @ EXP1N & EXP2E. REMEDY: OWNER TO REPAIR/ REPLACE AND MAINTAIN EXTERIOR WALLS AS PER CODE REQUIRED
- Construction
Issued Feb 26, 2026 — FAILURE TO MAINTAIN BLDG IN A CODE COMPLIANT MANNER. OBSERVED CRACKING /SPALLING PORCELAIN BRICK VENEER, MULTI LOCATIONS OF PARAPET LEVEL AT EXPOSURE 1 NORTH ELEVATION.OBSERVED CRACKING/SPALLING PORCELAIN BRICK VENEER, MULTI LOCATIONS AT EXPOSURE 2 EAST ELEVATION. REMEDY: OWNER TO REPAIR AND/OR REPLACE DAMAGED EXTERIOR BUILDING WALLS
- Immediate
Issued Sep 4, 2025 — PROVIDE EXTENTION APPX 15" LINEAR FEET OF SIDEWALK SHED @ EXPO#2 NORTH EASTERN CORNER ELEVATION
32 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M00926115-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Issued.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 74,561 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M00926115-I1
- BIN
- 1019906
- BBL
- 1009090046
- Postal code
- 10016 · 575 filings
- Review type
- Standard Plan Examination
- Existing stories
- 6
- Proposed stories
- 6
- Existing dwelling units
- 48
- Proposed dwelling units
- 48