NYC DOB record · M01112154-I1

216 East 29 Street

216 East 29 Street, Manhattan, NY 10016

Alteration filing in Murray Hill-Kips Bay, Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 15, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01112154-I1

216 East 29 Street

Manhattan, NY 10016

Alteration filing · status dated Oct 13, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
54
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01112154-I1 as a alteration filing at 216 East 29 Street, Manhattan, NY 10016. Its latest published status category is Approved, dated Oct 13, 2026. The filing records 54 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Oct 13, 2026
Proposed scale
54 proposed dwelling units
The building, not the filingopen housing violations, what it sold for and every filing at BIN 1019906Applicant of recordSee the 327 filings that name Arquitectura Varela
FiledSep 23, 2024
Current recordApproved
Proposed scale54 units
Recorded cost$5,000

What the filing says

A public-record reading of the proposed work.

Proposed installation of pipe scaffold for remedial repairs as per plans. no change in use occupancy or egress under this application.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 6-story elevator apartment building built in 1960, with 54 homes, on a 4,938 sq ft lot.

Built
1960
Last altered
1975
Floors
6
Residential units
54
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R8B
Lot area
4,938 sq ft
Building area
24,600 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 15, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 35 open notices on record for this building, out of 58 notices on file; the most recent was issued Aug 13, 2026.

  • Construction

    Issued Aug 13, 2026 — FAILURE TO MAINTAIN BLDG WALL & APPURTANCES. SPALLED/CRACKED MASONRY BRICKS MULTI LOCS OF PARAPET LVL,OPEN/REMOVED LINTEL BRICKS WITH WOOD BRACING INSTALL IN PLACE @ EXP1N & EXP2E. REMEDY: OWNER TO REPAIR/ REPLACE AND MAINTAIN EXTERIOR WALLS AS PER CODE REQUIRED

  • Construction

    Issued Feb 26, 2026 — FAILURE TO MAINTAIN BLDG IN A CODE COMPLIANT MANNER. OBSERVED CRACKING /SPALLING PORCELAIN BRICK VENEER, MULTI LOCATIONS OF PARAPET LEVEL AT EXPOSURE 1 NORTH ELEVATION.OBSERVED CRACKING/SPALLING PORCELAIN BRICK VENEER, MULTI LOCATIONS AT EXPOSURE 2 EAST ELEVATION. REMEDY: OWNER TO REPAIR AND/OR REPLACE DAMAGED EXTERIOR BUILDING WALLS

  • Immediate

    Issued Sep 4, 2025 — PROVIDE EXTENTION APPX 15" LINEAR FEET OF SIDEWALK SHED @ EXPO#2 NORTH EASTERN CORNER ELEVATION

  • 32 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 15, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01112154-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 80,574 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01112154-I1
BBL
1009090046
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
54
Proposed dwelling units
54
Scaffolding