What the filing says
A public-record reading of the proposed work.
Proposed installation of heavy duty sidewalk shed for remedial repairs as per plans. no change in use occupancy or egress under this application. live load 300 per square feet. sidewalk shed shall comply with chapter # 33 of the 2022 code
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 4-story outdoor recreation facility built in 1944, on a 83,100 sq ft lot.
- Built
- 1944
- Last altered
- 1990
- Floors
- 4
- Residential units
- 0
- Building type
- Outdoor recreation facility
- Land use
- Open space and outdoor recreation
- Zoning district
- R8
- Lot area
- 83,100 sq ft
- Building area
- 249,473 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 10, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 1 open notice on record for this building, out of 20 notices on file; the most recent was issued May 13, 2025.
- Construction
Issued May 13, 2025 — OBSERVED AT EXOSURE 1 MULTIPLE DEFECT ALONG PARAPET AREA CRACK & SPALLED STONES, CRACK AT 1ST FLOOR. EXP 2 CRACK, DAMAGED JOINTS AND CRACK PANE. EXP3 CRACK 1FL CORNER OF EXPOSURE 4. EXPOSURE 4 BROKEN WINDOW PANE, AND CRACK AT CORNER AT EXPOSURE 1. OBSERVED CORROSION OF GATES. REMEDY: MAINTAIN BUILDING REPAIR AND/OR REPLACE
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 10, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01452101-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01452101-I1
- BBL
- 1021380079
- Postal code
- 10032 · 113 filings
- Review type
- Professional Certification
- Existing stories
- 4
- Proposed stories
- 4
- Existing dwelling units
- 1
- Proposed dwelling units
- 1