NYC DOB record · M01412923-I1

217 Broadway

217 Broadway, Manhattan, NY 10007

Alteration filing in Tribeca-Civic Center, Manhattan. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 6, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01412923-I1

217 Broadway

Manhattan, NY 10007

Alteration filing · status dated Oct 1, 2026

Current record
Recorded as completed
Proposed scale
10 stories
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01412923-I1 as a alteration filing at 217 Broadway, Manhattan, NY 10007. Its latest published status category is Recorded as completed, dated Oct 1, 2026. The filing records 10 proposed stories.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Oct 1, 2026
Proposed scale
10 proposed stories
The building, not the filingopen housing violations, the owner of record and every filing at BIN 1001232Applicant of recordSee the 84 filings that name Gilsanz Murray Steficek LLP
FiledJun 11, 2026
Current recordRecorded as completed
Proposed scale10 stories
Recorded cost$35,000

What the filing says

A public-record reading of the proposed work.

Propose to remove convenience stair and infill the hole as per plans filed herewith.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 10-story office building built in 1918, on a 16,028 sq ft lot.

Built
1918
Last altered
1999
Floors
10
Residential units
0
Building type
Office building
Land use
Commercial and office
Zoning district
C5-3
Lot area
16,028 sq ft
Building area
133,198 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 7, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 11 open notices on record for this building, out of 102 notices on file; the most recent was issued Aug 17, 2026.

  • Construction

    Issued Aug 17, 2026 — FAILURE TO COMPLY WITH COMMISSIONER'S ORDER #350603 DATED 04/15/26 (041526FEU10102PN)REQUESTING OWNR TO IMMED RTAIN NYSPE TO EVAL&REPAIR ENTIRE VAULT&FOUNDATION WALLS W/THE BLDG BEING PERM RPAIR STARTNG BY 06/08/26.AS OF 08/17/26 HERE ARE NO JOBS FILED IN BIS OR DOBNOW TO PERM RPAIR BLDG UNDR PERMT.IMMED COMPLY W/COMMISSIONER'S ORDER#350603

  • Construction

    Issued Aug 17, 2026 — FAILURE TO COMPLY WITH COMMISSIONER'S ORDER #350602 DATED 4/15/26 (041526FEU10101PN)REQUIRING OWNR TO IMMED WEATHRPROOF PRTLLY OPEN VAULT ALNG VASSEY ST UNDR FULLTIME NYSPE SUPERVISION,PRVDE DAILY RPRTS &FILING FOR PERMT W/IN 2 DAYS FRM STRT OF WRK.AS OF 08/14/2026 THERE HAS BEEN NO DAILY PROGRESS RPRTS SUBMITTD TO FEU&THERE ARE NO JOBS FIL

  • Construction

    Issued Apr 15, 2026 — FAILURE TO MAINTAIN BLDG IN SAFE CONDITION.DUE TO STREET WRK ALNG VESSEY ST BY NYC DDC&THEIR GC,EXP SDWLK WAS OPEN/EXPOSED.SIDEWALK/ VAULT STEEL BEAMS WERE CORRODED.VAULT WALL@STEEL BEAMS.REMVD/REPLACED OWNR TO RTAIN NYSPE TO EVAL ENT VAULT&FDN WALL@STEEL BEAMS REMVD/ REPLACED.OWNR TO RTAIN NYSPE TO EVAL ENT VAULT&FDN WALLS&FILE REPAIR

  • 8 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 7, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01412923-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01412923-I1
BBL
1000880001
Review type
Professional Certification
Existing stories
10
Proposed stories
10
Existing dwelling units
0
Proposed dwelling units
0
General constructionStructural work