What the filing says
A public-record reading of the proposed work.
Install new illuminated sign read "cotti coffee"as per plan. no change in use, egress, and occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 10-story office building built in 1918, on a 16,028 sq ft lot.
- Built
- 1918
- Last altered
- 1999
- Floors
- 10
- Residential units
- 0
- Building type
- Office building
- Land use
- Commercial and office
- Zoning district
- C5-3
- Lot area
- 16,028 sq ft
- Building area
- 133,198 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 12, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 11 open notices on record for this building, out of 102 notices on file; the most recent was issued Aug 17, 2026.
- Construction
Issued Aug 17, 2026 — FAILURE TO COMPLY WITH COMMISSIONER'S ORDER #350602 DATED 4/15/26 (041526FEU10101PN)REQUIRING OWNR TO IMMED WEATHRPROOF PRTLLY OPEN VAULT ALNG VASSEY ST UNDR FULLTIME NYSPE SUPERVISION,PRVDE DAILY RPRTS &FILING FOR PERMT W/IN 2 DAYS FRM STRT OF WRK.AS OF 08/14/2026 THERE HAS BEEN NO DAILY PROGRESS RPRTS SUBMITTD TO FEU&THERE ARE NO JOBS FIL
- Construction
Issued Aug 17, 2026 — FAILURE TO COMPLY WITH COMMISSIONER'S ORDER #350603 DATED 04/15/26 (041526FEU10102PN)REQUESTING OWNR TO IMMED RTAIN NYSPE TO EVAL&REPAIR ENTIRE VAULT&FOUNDATION WALLS W/THE BLDG BEING PERM RPAIR STARTNG BY 06/08/26.AS OF 08/17/26 HERE ARE NO JOBS FILED IN BIS OR DOBNOW TO PERM RPAIR BLDG UNDR PERMT.IMMED COMPLY W/COMMISSIONER'S ORDER#350603
- Construction
Issued Apr 15, 2026 — EMERGENCY WORK ORDER.DUE TO STREET WRK BY NYC DDC&THEIR CNCTRCTR,ALNG VESSEY ST,THE CELLAR VULT WAS OPENED&EXPOSD TO THE ELEMENTS.STEEL BEAMS@SDWLK LVL WERE CORRODED.BLDG VAULT WAS WTHPRF.OWNR TO IMMED RTAIN NYSPE&DOB REG GC 1.SBMT MEANS&METHODS TO DOB TO WEATHPRF THE CELLAR VAULT, 2.UPON APPRVL STRT WRK
8 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 12, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01486069-I1.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 95,779 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01486069-I1
- BBL
- 1000880001
- Postal code
- 10007 · 284 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 0
- Proposed dwelling units
- 0