NYC DOB record · M01365911-I1

218 2 Avenue

218 2 Avenue, Manhattan, NY 10003

Alteration filing in East Village, Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 8, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01365911-I1

218 2 Avenue

Manhattan, NY 10003

Alteration filing · status dated Sep 3, 2026

Current record
Approved
Proposed scale
6 stories
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01365911-I1 as a alteration filing at 218 2 Avenue, Manhattan, NY 10003. Its latest published status category is Approved, dated Sep 3, 2026. The filing records 6 proposed stories.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Sep 3, 2026
Proposed scale
6 proposed stories
Applicant of recordSee the 141 filings that name Rigid Structural Design, LLC
FiledMar 17, 2026
Current recordApproved
Proposed scale6 stories
Recorded cost$2,500

What the filing says

A public-record reading of the proposed work.

Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 6-story health facility built in 1900, on a 15,288 sq ft lot.

Built
1900
Floors
6
Residential units
0
Building type
Health facility
Land use
Public facilities and institutions
Zoning district
C1-7A
Lot area
15,288 sq ft
Building area
56,756 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 8, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 4 open notices on record for this building, out of 36 notices on file; the most recent was issued Feb 3, 2026.

  • Construction

    Issued Feb 3, 2026 — EMERGENCY WORK ORDER DUE TO CRACK SPALLING AT ROOF CORNICE AND CRACK STONE ABOVE BUILDING ENTRANCE AT 2ND AVENUE. REMEDY: IMMEDIATELY PROVIDE FULL SAFETY MEASURES AT EXPOSURE 1 UNDER DIRECTION OF NYC LICENSED PROFESSIONAL

  • Construction

    Issued Feb 3, 2026 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBSERVED MULTIPLE DEFECTED CONDITIONS. MISSING CRACK STONES, OPEN JOINTS AT EXPOSURE 1 AND 4.CRACK JOINTS @ EXPOSURE 3. CRACK SPALLING BULGING EXPOSURE 3 & DEFECTED FIRE ESCAPE. ROOF BROKEN PANE & SPALLING REMEDY: REPAIR AND/OR REPLACE

  • Construction

    Issued Aug 13, 2025 — FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. AT TIME OF INSPECTION OBSERVED @ EXP#1 MISSING/SEPARATION IN WALL @ BRICK JOINT EXP#2 OBSERVED MULTIPLE STEP CRACK/RUST @ WINDOW. EXP#3 LEANING BRICKS WITH NO MORTAR & ABOUT TO COLLAPSE. EXP4 MULTIPLE CRACKS IN LOWER CORNICE SPALLING CRACK STONE MULT LOCATIONS. REMEDY: REPAIR & REPLACE

  • 1 further open notice is on file. Open the source dataset for the full list.

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 8, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01365911-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Current status updated

    The latest recorded filing status is “Permit Entire.”

    03

For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01365911-I1
BIN
1006510
BBL
1004550001
Review type
Professional Certification
Existing stories
6
Proposed stories
6
Existing dwelling units
0
Proposed dwelling units
0