What the filing says
A public-record reading of the proposed work.
Suspended Scaffold for Facade Restoration as Shown Plans
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 31-story elevator apartment building built in 1961, with 788 homes, on a 33,340 sq ft lot.
- Built
- 1961
- Last altered
- 2013
- Floors
- 31
- Residential units
- 788
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- C5-5
- Lot area
- 33,340 sq ft
- Building area
- 762,175 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 19, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 5 open notices on record for this building, out of 224 notices on file; the most recent was issued Aug 4, 2026.
- Construction
Issued Aug 4, 2026 — EMERGENCY WORK:STRUCTURAL CRACKING OBSERVED IN BM33-04.IMMEDIATE STABILIZATION AND REPAIR ARE REQUIRED FOR STRUCTURAL CRACKING IN BM33-04.REMEDY:IMMEDIATELY STABILIZE AND REPAIR BM33-04 UNDER FULL- TIME NYS PE,SIA,SSM AND CS.SIGNED AND SEALED SKETCHES ARE REQUIRED.AN APP MUST BE OPEN TO REFLECT SHORING REPAIR W/IN 2DAYS OF COMMENCEMENT
- Construction
Issued Jul 27, 2026 — AT THE TIME OF INSPECTION:OBSERVED A CRACK OCCURED AT BOTTOM OF MIDDLE 18X54CONCRETE BEAM AT EMR FLOOR.THE STRUCTURAL FAILURE REPRESENTS A POTENTIAL HAZARD TO THE PUBLIC.REMEDY:IMMEDIATELY DEVELOP&IMPLEMENT MONITORING PROTOCOL:OPTICAL MONITORING 2XWEEK-CRACK MONITOR 2XWEEK- MANDATE WEEKLY REPORT TO DOB.CEU NEEDS ALL INFO STARTING 7/26/26
- Construction
Issued Jul 27, 2026 — PEER REVIEW-DEPT ORDERING A PEER REVIEW OF THE STRUCTURAL DESIGN & RELEVANT,ASSOCIATED SPECIAL REPORTS/SHOP DRAWINGS.TWO 14X48BEAMS EXHIBITED SIGNS OF SHEAR FAILURE.ONE 18X54 BEAM WAS OBSERVED TO HAVE SIGNS OF FLEXURE FAILURE.REMEDY:PROVIDE NAMES OF 3 NYS PE'S BY 8/5/26 SUBMIT PEER REVIEW REPORT PURSUANT TO BC 1618 BY 8/24/26
2 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 19, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01450930-I1.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 65,533 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01450930-I1
- BBL
- 1000890012
- Postal code
- 10038 · 148 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- Empty in the source
- Proposed dwelling units
- Empty in the source








