NYC DOB record · M01339571-S1

222 Central Park South

222 Central Park South, Manhattan, NY 10019

Alteration filing in Midtown-Times Square, Manhattan. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Nov 1, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01339571-S1

222 Central Park South

Manhattan, NY 10019

Alteration filing · status dated Oct 30, 2026

Current record
Recorded as completed
Proposed scale
15 stories
Dwelling units
30
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01339571-S1 as a alteration filing at 222 Central Park South, Manhattan, NY 10019. Its latest published status category is Recorded as completed, dated Oct 30, 2026. The filing records 15 proposed stories and 30 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Oct 30, 2026
Proposed scale
15 proposed stories and 30 proposed dwelling units
The building, not the filingopen housing violations, what it sold for, apartment sizes and every filing at BIN 1024920Applicant of recordSee the 9 filings that name Altieriseborwieber LLC
FiledJan 14, 2026
Current recordRecorded as completed
Proposed scale15 stories
Recorded cost$19,000

What the filing says

A public-record reading of the proposed work.

Herewith filing for the installation of plumbing fixtures, as per plans submitted. No change to use, egress or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 8-story elevator apartment building built in 1908, with 30 homes, on a 5,021 sq ft lot.

Built
1908
Last altered
1980
Floors
8
Residential units
30
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R10H
Lot area
5,021 sq ft
Building area
62,800 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 1, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 11 open notices on record for this building, out of 54 notices on file; the most recent was issued Feb 27, 2026.

  • Construction

    Issued Feb 27, 2026 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBSERVED @ EXP2 EAST ELEVATION SPALLING AND MISSING BRICKS AT PARAPET ROOF SPALLING @ PARAPET. DEFECTS AT BULKHEAD, SPALL/FLAKE PAINT. REMEDY: REPAIR AND/OR REPLACE

  • Construction

    Issued Aug 27, 2025 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.AS NOTED AT THE TIME OF INSPECTION,I OBSERVED ON EXP1 NORTH ELEV,MISSING SECTION OF PA RAPET/CORNICE.EXP2 EAST ELEV,DAMAGED BRICKS,MISSING BRICK AT PARAPET.R EMEDY:REPAIR AND/OR REPLACE MISSING SECTIONS OF PARAPET FACADE

  • Construction

    Issued Sep 19, 2024 — FAILURE TO MAINTAIN BUILDING. OBSERVED ON EXP 1 N.ELEV:-CRACKED, DAMAGE MASONRY @ THE 3RD FL LINTEL & AT THE 6TH FL DECORATIVE MASONRY MULLON, CRACKS ON PARAPET. EXP2,3 & 4:-SPALLING ERODING BRICKS AT MULTIPLE FLS. ROOF: CRACKS IN TERRA-COTTA ON CHIMNIES. REMEDY: REPAIR AND OR REPLACE ALL DAMAGE FACADE

  • 8 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 1, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01339571-S1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 91,066 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01339571-S1
BBL
1010300046
Review type
Professional Certification
Existing stories
15
Proposed stories
15
Existing dwelling units
30
Proposed dwelling units
30