What the filing says
A public-record reading of the proposed work.
Northwell New MEETH Emergency Generator & Quick Connect Project: installation of fuel oil piping at above premises, for new Emergency Generator @ Roof level, as per plans filed herewith.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a health facility built in 1987, on a 17,572 sq ft lot.
- Built
- 1987
- Residential units
- 0
- Building type
- Health facility
- Land use
- Public facilities and institutions
- Zoning district
- R8B
- Lot area
- 17,572 sq ft
- Building area
- 103,000 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 18, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 10 open notices on record for this building, out of 130 notices on file; the most recent was issued Jul 29, 2025.
- Construction
Issued Jul 29, 2025 — EMERGENCY WORK ORDER TO IMMEDIATELY INSTALL SAFETY MEASURES AT DESINATED UNSAFE BUILDING FILING AT EXP# 1. REMEDY: IMMEDIATELY REMOVE OR REPAIR HAZARDOUS CONDITIONS STATED IN UNSAFE REPORT AND IMMEDIATELY PROVIDE SAFETY MEASURES UNDER PROFESSIONAL LICENSED PROFESSIONAL
- Hazardous condition (facade)
Issued Feb 20, 2025 — CYCLE 9B UNSAFE REPORT FILED
- Elevator
Issued Dec 30, 2021
7 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 17, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01105557-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 68,520 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01105557-I1
- BBL
- 1014180032
- Postal code
- 10065 · 391 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 0
- Proposed dwelling units
- 0