What the filing says
A public-record reading of the proposed work.
Installation of new sprinkler heads on Basement, Ground fl, Mezzanine, 005, 007, 009, 010, 012, 014, 015, 017, 034 floors. No change in use, egress or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 44-story office building built in 1927, on a 16,409 sq ft lot.
- Built
- 1927
- Floors
- 44
- Residential units
- 0
- Building type
- Office building
- Land use
- Commercial and office
- Zoning district
- C5-3
- Lot area
- 16,409 sq ft
- Building area
- 480,831 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 26, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 13 open notices on record for this building, out of 295 notices on file; the most recent was issued May 11, 2026.
- Elevator
Issued May 11, 2026 — VF CEASE USED WATER DAMEGE ON ELEVATOR. REPAIR AND CONTACT D O B AT EIR @BUILDINGS.NYC.GOV. AND 2123932435. TO RETURN DEVICE TO SERVICE.
- Elevator
Issued May 11, 2026 — VF.. CEASE USED.. WATER DAMEGE ON ELEVATOR . REPAIR AND CONTACT DOB AT EIR @BUILDINGS.NYC.GOV. AND 2123932435.. TO RETURN DEVICE TO SERVICE...
- Elevator
Issued May 11, 2026 — VF CEASE USED. WATER DAMEGE ON ELEVATOR REPAIR AND CONTACT DOB EIR @BUILDINGS.NYC.GOV AND 2123932435.. TO RETURN DEVICE TO SERVICE...
10 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 26, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01159723-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 87,253 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01159723-I1
- BBL
- 1000880018
- Postal code
- 10007 · 239 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 0
- Proposed dwelling units
- 0








