What the filing says
A public-record reading of the proposed work.
Sprinkler modifications taking place in the sub-cellar and sub-cellar 2 as per drawings filed herewith. no change in use, egress or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 16-story condominium built in 1932, on a 50,637 sq ft lot.
- Built
- 1932
- Last altered
- 2008
- Floors
- 16
- Residential units
- 0
- Building type
- Condominium
- Land use
- Commercial and office
- Zoning district
- C6-5
- Lot area
- 50,637 sq ft
- Building area
- 589,617 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 16, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 45 open notices on record for this building, out of 263 notices on file; the most recent was issued Jan 26, 2022.
- Hazardous condition (facade)
Issued Jan 26, 2022 — CYCLE 9A UNSAFE REPORT FILED
- Elevator
Issued Oct 22, 2021
- Elevator
Issued Oct 22, 2021
42 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 16, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01406450-S2.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,798 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01406450-S2
- BIN
- 1088760
- BBL
- 1010157501
- Postal code
- 10036 · 469 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 0
- Proposed dwelling units
- 0