What the filing says
A public-record reading of the proposed work.
Alteration type ii. interior renovation on existing one family dwelling as per hpd number 249313. and no mechanical work. no increase in bulk or far. no change in use or occupancy. no exterior/facade work and no fenestration.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 2.5-story one-family home built in 1930, on a 2,310 sq ft lot.
- Built
- 1930
- Floors
- 2.5
- Residential units
- 1
- Building type
- One-family home
- Land use
- One and two family homes
- Zoning district
- R4
- Lot area
- 2,310 sq ft
- Building area
- 1,440 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 2 notices on file; the most recent was issued Mar 10, 2021.
- Construction
Issued Mar 10, 2021 — BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED UNDER .APPLICATION #321977964 ON 3/10/2021 DUE TO APPLICANT WITHDRAWAL
- Construction
Issued Mar 10, 2021 — BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED UNDER .APPLICATION #321977964 ON 3/10/2021 DUE TO APPLICANT WITHDRAWAL
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00487704-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00487704-I1
- BBL
- 3073810042
- Postal code
- 11229 · 1109 filings
- Review type
- Standard Plan Examination
- Existing stories
- 2
- Proposed stories
- 2
- Existing dwelling units
- 1
- Proposed dwelling units
- 1








