What the filing says
A public-record reading of the proposed work.
Installation of 300psf sidewalk shed as per plans. all equipment shall comply with ch #33 of the NYC code 2022. no change in use, occupancy or egress under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 5-story walk-up apartment building built in 1916, with 29 homes, on a 5,000 sq ft lot.
- Built
- 1916
- Floors
- 5
- Residential units
- 29
- Building type
- Walk-up apartment building
- Land use
- Mixed residential and commercial
- Zoning district
- M1-2/R5D
- Lot area
- 5,000 sq ft
- Building area
- 19,625 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 31, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 3 notices on file; the most recent was issued Jul 21, 2026.
- Construction
Issued Jul 21, 2026 — FTM BLDG IN CODE COMPLIANT MANNER-OBSVD PARAPET WALL AT ELEV/EXP1-2-3 &4 W/VERT CRACKS, SPALLING BRICKS, CRACKED STUCCO & PORTIONS OF WALL LEANING OUTWARD.AN ANNUAL PARAPET OBSERVATION REPORT IS REQ'D FOR PRIOR YEAR 2025 & T/BE REC'D BY DOB NO LATER THAN 08/04/26
- Construction
Issued Jul 21, 2026 — CORRECTIVE ACTION PLAN REQ'D-OBSVD HAZ CONDITIONS ABOVE THE ENTRYWAY INTO STORE-DETACHED CEILING PANEL @ RISK OF COLLASPE.OBSVD @ VARIOUS LOCATIONS VERT STEP CRACKS TO BRICKS AND MORTAR. OWNER TO IMMED RETAIN REG DESIGN PROF IN GOOD STANDING W/DOB&NYS TO EVAL ENTIRE BLDG AND SUBMIT A CORRECTIVE ACTION PLAN
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 31, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing Q01436477-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 90,393 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- Q01436477-I1
- BIN
- 4004920
- BBL
- 4004070026
- Postal code
- 11101 · 845 filings
- Review type
- Professional Certification
- Existing stories
- 5
- Proposed stories
- 5
- Existing dwelling units
- 30
- Proposed dwelling units
- 30








