NYC DOB record · B00129245-I1

240 Prospect Place

240 Prospect Place, Brooklyn, NY 11238

Alteration filing in Prospect Heights, Brooklyn. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 11, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00129245-I1

240 Prospect Place

Brooklyn, NY 11238

Alteration filing · status dated Dec 28, 2020

Current record
Approved
Proposed scale
Not stated
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00129245-I1 as a alteration filing at 240 Prospect Place, Brooklyn, NY 11238. Its latest published status category is Approved, dated Dec 28, 2020. The published record does not state proposed stories or dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Dec 28, 2020
Proposed scale
Not stated in this filing
Complete building dossierView all 2 filings associated with BIN 3255808Applicant of recordSee the 974 filings that name Syed Engineering, P.C.
FiledFeb 15, 2019
Current recordApproved
Proposed scaleNot specified
Recorded cost$5,000

What the filing says

A public-record reading of the proposed work.

Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the NYC building code. no change in use, occupancy, or egress under this application.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 4-story condominium built in 1898, with 9 homes, on a 3,250 sq ft lot.

Built
1898
Last altered
1988
Floors
4
Residential units
9
Building type
Condominium
Land use
Mixed residential and commercial
Zoning district
R7A
Lot area
3,250 sq ft
Building area
8,374 sq ft
Historic district
Prospect Heights Historic District

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00129245-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Current status updated

    The latest recorded filing status is “Permit Entire.”

    03

For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00129245-I1
BBL
3011597501
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
Empty in the source
Proposed dwelling units
Empty in the source