NYC DOB record · M01027204-S1

245 East 24 Street

245 East 24 Street, Manhattan, NY 10010

Alteration filing in Murray Hill-Kips Bay, Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 26, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01027204-S1

245 East 24 Street

Manhattan, NY 10010

Alteration filing · status dated Sep 23, 2026

Current record
Approved
Proposed scale
16 stories
Dwelling units
176
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01027204-S1 as a alteration filing at 245 East 24 Street, Manhattan, NY 10010. Its latest published status category is Approved, dated Sep 23, 2026. The filing records 16 proposed stories and 176 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Sep 23, 2026
Proposed scale
16 proposed stories and 176 proposed dwelling units
The building, not the filingopen housing violations, what it sold for, apartment sizes and every filing at BIN 1019791Applicant of recordSee the 306 filings that name Rigid Structural Design, LLC
FiledJun 5, 2024
Current recordApproved
Proposed scale16 stories
Recorded cost$500

What the filing says

A public-record reading of the proposed work.

Temporary Structural Bracing and Partial Demolition during Facade repairs. No Change in use, Egress or Occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 16-story elevator apartment building built in 1963, with 162 homes, on a 9,636 sq ft lot.

Built
1963
Last altered
1982
Floors
16
Residential units
162
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
C1-8A
Lot area
9,636 sq ft
Building area
112,641 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 26, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 4 open notices on record for this building, out of 55 notices on file; the most recent was issued Dec 23, 2025.

  • Construction

    Issued Dec 23, 2025 — DEPARTMENT OF BUILDINGS INTENDS TO REVOKE ALL APPROVALS AND PERMITS ISSUED IN CONNECTION WITH APPLICATION #M01076979-I1 WITHIN 15 DAYS OF THIS LETTER UNLESS SUFFICIENT INFORMATION IS SUBMITTED TO DOB. NEW SPECIAL INSPECTOR MUST SUPERSEDE MR.KAVI AND SUBMIT AN IDENTIFYING TR-1 TO THE DEPARTMENT TO PREVENT REVOCATION.

  • Elevator

    Issued Mar 2, 2016

  • Elevator

    Issued Jan 29, 2014

  • 1 further open notice is on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 25, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01027204-S1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01027204-S1
BBL
1009050026
Review type
Standard Plan Examination
Existing stories
16
Proposed stories
16
Existing dwelling units
176
Proposed dwelling units
176
Structural work