What the filing says
A public-record reading of the proposed work.
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 16-story elevator apartment building built in 1963, with 162 homes, on a 9,636 sq ft lot.
- Built
- 1963
- Last altered
- 1982
- Floors
- 16
- Residential units
- 162
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- C1-8A
- Lot area
- 9,636 sq ft
- Building area
- 112,641 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 8, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 4 open notices on record for this building, out of 55 notices on file; the most recent was issued Dec 23, 2025.
- Construction
Issued Dec 23, 2025 — DEPARTMENT OF BUILDINGS INTENDS TO REVOKE ALL APPROVALS AND PERMITS ISSUED IN CONNECTION WITH APPLICATION #M01076979-I1 WITHIN 15 DAYS OF THIS LETTER UNLESS SUFFICIENT INFORMATION IS SUBMITTED TO DOB. NEW SPECIAL INSPECTOR MUST SUPERSEDE MR.KAVI AND SUBMIT AN IDENTIFYING TR-1 TO THE DEPARTMENT TO PREVENT REVOCATION.
- Elevator
Issued Mar 2, 2016
- Elevator
Issued Jan 29, 2014
1 further open notice is on file. Open the source dataset for the full list.
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01072935-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01072935-I1
- BIN
- 1019791
- BBL
- 1009050026
- Postal code
- 10010 · 238 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 176
- Proposed dwelling units
- 176