What the filing says
A public-record reading of the proposed work.
Propose new 12 ft curb cut (without splays) for new building (old curb cuts at vacant lot to be removed)
Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a vacant land on a 3,800 sq ft lot.
- Residential units
- 0
- Building type
- Vacant land
- Land use
- Vacant land
- Zoning district
- R5
- Lot area
- 3,800 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 3, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 4 open notices on record for this building, out of 5 notices on file; the most recent was issued Dec 18, 2017.
- Construction
Issued Dec 18, 2017 — FTM&ADD'L INFO REQ.UPPER RUBBLE RETAIN WALL SUPPORT ADJOINING UPPER GROUND PREMISES92265 SEDGWICK AVE) HAS PART COLL.FOUND OF ADJ PROP 2265 SEDGWICK AVE MAY BE COMPROMISED.REMEDY:OWN HAS TO ENGAGE NYS PROF ENG FULLY EVAL STRL STAB OF BLDG LOC AT 2265 SEDGWICK AVE.EVALUATION TO BE FINISHED NO LATER THAN 2/15/18
- Construction
Issued Jun 6, 2017 — FAILURE TO COMPLY WITH COMMISSIONER ORDER#334559 ISSUED 4/4/17 TO OBTAIN PERMITS FOR REPAIR/DEMO RETAINING WALL AT REAR OF PROP NO LATER THAN 5/5/17.PERMITS HAVE NOT BEEN OBTAINED AS OF 6/6/17.REMEDY:COMPLY WITH COMMISSIONER ORDER#334559 IMMED
- Construction
Issued Apr 4, 2017 — FM RETAIN WALL.RETAIN WALL AT REAR OF PREMISES IS PART COLL,DISLODGED& AT RISKOF FURTHER COLL.OWNER RESP TO MAINTAIN WALL IN SAFE COND.JOINT RESP OF OWNERS ON EACH SIDE OF RETAIN STRUCT TO MAINTAIN IT.REMEDY: OWNER ENGAGE NYSPE ENG'R&CONTR EVAL WHOLE RETAIN WALL,OBTAIN PERM FOR REPAIR/DEMO WORK NO LATER 5/5/17.WORK SIGNED OFF NO LATER 10/12/17
1 further open notice is on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 2, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X01347404-S6.
- Current status updated02
The latest recorded filing status is “Objections.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 74,561 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X01347404-S6
- BIN
- 2131339
- BBL
- 2032340080
- Postal code
- 10468 · 177 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- 1
- Existing dwelling units
- Empty in the source
- Proposed dwelling units
- 0