What the filing says
A public-record reading of the proposed work.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the NYC building code. no change in use, occupancy, or egress under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 11-story elevator apartment building built in 1903, with 61 homes, on a 5,625 sq ft lot.
- Built
- 1903
- Last altered
- 2016
- Floors
- 11
- Residential units
- 61
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R8B
- Lot area
- 5,625 sq ft
- Building area
- 50,600 sq ft
- Historic district
- West End-Collegiate Historic District Extension
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 12, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 8 open notices on record for this building, out of 58 notices on file; the most recent was issued Apr 8, 2026.
- Construction
Issued Apr 8, 2026 — FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER AS PER SECTION 28.301.1 OF THE NYC ADMIN CODE. NOTED AT TIME OF INSPECTION AT EXPOSURE 1 VERTICAL CRACK THROUGH BRICK AND DAMAGED MASINRY AT PARAPET FACING EXPOSURE 2. BULKHEAD HAVE CRACKE STUCCO AND HAIRLINE CRACKS REMEDY: FIX AND/OR REPLACE
- Fail to certify class
Issued Mar 5, 2025 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
- Fail to certify class
Issued Dec 11, 2024 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
5 further open notices are on file. Open the source dataset for the full list.
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M00834115-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded04
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M00834115-I1
- BIN
- 1030847
- BBL
- 1011670059
- Postal code
- 10023 · 304 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 61
- Proposed dwelling units
- 61