NYC DOB record · M01391643-I1

252 West 76 Street

252 West 76 Street, Manhattan, NY 10023

Alteration filing in Upper West Side (Central), Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 29, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01391643-I1

252 West 76 Street

Manhattan, NY 10023

Alteration filing · status dated Oct 27, 2026

Current record
Approved
Proposed scale
11 stories
Dwelling units
61
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01391643-I1 as a alteration filing at 252 West 76 Street, Manhattan, NY 10023. Its latest published status category is Approved, dated Oct 27, 2026. The filing records 11 proposed stories and 61 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Oct 27, 2026
Proposed scale
11 proposed stories and 61 proposed dwelling units
The building, not the filingopen housing violations, what it sold for, apartment sizes and every filing at BIN 1030847Applicant of recordSee the 953 filings that name Always Fast Services Corp
FiledApr 28, 2026
Current recordApproved
Proposed scale11 stories
Recorded cost$5,000

What the filing says

A public-record reading of the proposed work.

Installation of 300psf sidewalk shed and pipe scaffolding as per plans. sidewalk shed and pipe scaffolding shall comply with chapter #33 of the 2022 code no change in use, egress or occupancy under this application.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 11-story elevator apartment building built in 1903, with 61 homes, on a 5,625 sq ft lot.

Built
1903
Last altered
2016
Floors
11
Residential units
61
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R8B
Lot area
5,625 sq ft
Building area
50,600 sq ft
Historic district
West End-Collegiate Historic District Extension

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 29, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 8 open notices on record for this building, out of 58 notices on file; the most recent was issued Apr 8, 2026.

  • Construction

    Issued Apr 8, 2026 — FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER AS PER SECTION 28.301.1 OF THE NYC ADMIN CODE. NOTED AT TIME OF INSPECTION AT EXPOSURE 1 VERTICAL CRACK THROUGH BRICK AND DAMAGED MASINRY AT PARAPET FACING EXPOSURE 2. BULKHEAD HAVE CRACKE STUCCO AND HAIRLINE CRACKS REMEDY: FIX AND/OR REPLACE

  • Fail to certify class

    Issued Mar 5, 2025 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION

  • Fail to certify class

    Issued Dec 11, 2024 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION

  • 5 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 29, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01391643-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 88,832 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01391643-I1
BBL
1011670059
Review type
Professional Certification
Existing stories
11
Proposed stories
11
Existing dwelling units
61
Proposed dwelling units
61
Sidewalk shedScaffolding