NYC DOB record · B01458100-I1

253 Washington Avenue

253 Washington Avenue, Brooklyn, NY 11205

Alteration filing in Clinton Hill, Brooklyn. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 13, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B01458100-I1

253 Washington Avenue

Brooklyn, NY 11205

Alteration filing · status dated Sep 11, 2026

Current record
Approved
Proposed scale
6 stories
Dwelling units
29
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B01458100-I1 as a alteration filing at 253 Washington Avenue, Brooklyn, NY 11205. Its latest published status category is Approved, dated Sep 11, 2026. The filing records 6 proposed stories and 29 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Sep 11, 2026
Proposed scale
6 proposed stories and 29 proposed dwelling units
Applicant of recordSee the 150 filings that name Mchenery Testing Lab
FiledSep 10, 2026
Current recordApproved
Proposed scale6 stories
Recorded cost$12,000

What the filing says

A public-record reading of the proposed work.

Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the NYC building code. no change in use, occupancy, or egress under this application.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 6-story elevator apartment building built in 1928, with 29 homes, on a 6,960 sq ft lot.

Built
1928
Floors
6
Residential units
29
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R6B
Lot area
6,960 sq ft
Building area
32,160 sq ft
Historic district
Clinton Hill Historic District

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 13, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 2 open notices on record for this building, out of 19 notices on file; the most recent was issued May 29, 2026.

  • Construction

    Issued May 29, 2026 — FTC W/COMMISSIONER'S ORDER CONTROL#348147 VIO#041526PI30202AG DATED 04/15/26 REQUIRING OWNER TO PROVIDE A CORRECTIVE ACTION PLAN BY APRIL 9, 2026. AS OF MAY 29, 2026 THE REQ'D CAP WAS NOT REC'D. IMMED COMPLY WITH COMMISIONER'S ORDER CONTROL#348147 VIO#041526PI30202AG

  • Construction

    Issued Apr 15, 2026 — CORRECTIVE ACTION PLAN REQ'D-EXP1 DIAGNOL STEP CACK ABOVE CELLAR ENTRANCE,VERT MASONRY STEP CRACK ABOVE MAIN ENTRANCE,EXP3 STUCCO SPALLING/CRACKING @ SEVERAL WINDOW OPENINGS,EXP4 MULT MASONRY CRACKS OBSVD ABOVE 6FL WINDOW. OWNER TO IMMED RETAIN REG DESIGN PROF IN GOOD STANDING W/DOB&NYS TO EVAL ENTIRE BLDG&SUBMIT CORRECTIVE ACTION PLAN

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 13, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B01458100-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Current status updated

    The latest recorded filing status is “Permit Entire.”

    03

For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B01458100-I1
BIN
3055093
BBL
3019180024
Review type
Professional Certification
Existing stories
6
Proposed stories
6
Existing dwelling units
29
Proposed dwelling units
29