What the filing says
A public-record reading of the proposed work.
Installation of heavy duty sidewalk shed as per plans. no change in use, egress or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 4-story elevator apartment building built in 1905, with 36 homes, on a 10,017 sq ft lot.
- Built
- 1905
- Last altered
- 2000
- Floors
- 4
- Residential units
- 36
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R6B
- Lot area
- 10,017 sq ft
- Building area
- 40,000 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 10, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 4 open notices on record for this building, out of 92 notices on file; the most recent was issued Aug 6, 2026.
- Construction
Issued Aug 6, 2026 — OBSERVED STRUCTURAL ALTERATIONS PERFORMED AT EXPOSURE-1 OF CELLAR LEVEL/SIDEWALK VAULT NOT INDICATED ON OR CONFORMING WITH ANY APPROVED PLANS. NO APPLICABLE STRUCTURAL FILINGS FOR CONDITIONS, STRUCTURAL STABILITY UNKNOWN. AS SUCH, FULL STRUCTURAL STABILITY ASSESSMENT OF PROPERTY IS REQUIRED TO BE SUBMITTED TO DEPARTMENT OF BUILDINGS WITHIN
- Construction
Issued May 4, 2001 — HAZARFDOUS
- Local law 10/81 -
Issued Jan 13, 1997
1 further open notice is on file. Open the source dataset for the full list.
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00021039-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Sign-off date recorded04
DOB lists a sign-off date for this filing.
- Current status updated05
The latest recorded filing status is “LOC Issued.”
For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00021039-I1
- BBL
- 3008730069
- Postal code
- 11215 · 2962 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- Empty in the source
- Proposed dwelling units
- Empty in the source