NYC DOB record · X01402489-S1

2592 Third Avenue

2592 Third Avenue, Bronx, NY 10454

Full demolition filing in Mott Haven-Port Morris, Bronx. The latest DOB status is full demolition signed-off.

DOB has signed off on the completed demolition. What every status means

Recorded as completedFull demolition

NYC Department of Buildings · w9ak-ipjd · accessed Oct 7, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · X01402489-S1

2592 Third Avenue

Bronx, NY 10454

Full demolition · status dated Oct 5, 2026

Current record
Recorded as completed
Proposed scale
Not stated
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing X01402489-S1 as a full demolition at 2592 Third Avenue, Bronx, NY 10454. Its latest published status category is Recorded as completed, dated Oct 5, 2026. The published record does not state proposed stories or dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Full demolition
Latest status
Recorded as completed
Latest status date
Oct 5, 2026
Proposed scale
Not stated in this filing
The building, not the filingopen housing violations, the owner of record and every filing at BIN 2000704Applicant of recordSee the 202 filings that name South Bay Engineering PLLC
FiledJul 15, 2026
Current recordRecorded as completed
Proposed scaleNot specified
Recorded cost$850,000

What the filing says

A public-record reading of the proposed work.

Full demolition of two-story structure, under HPD & DOB IED.

Street Futures classifies this record as a full demolition based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 2-story mainly residential with some commercial built in 1931, on a 2,156 sq ft lot.

Built
1931
Floors
2
Residential units
2
Building type
Mainly residential with some commercial
Land use
Mixed residential and commercial
Zoning district
R6
Lot area
2,156 sq ft
Building area
3,404 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 7, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 18 open notices on record for this building, out of 21 notices on file; the most recent was issued May 6, 2026.

  • Construction

    Issued May 6, 2026 — STRUCTURE RENDERED NON-COMPLIANT. AT TIME OF INSPECTION OBSERVED SEVERE FIRE, WATER AND SMOKE DAMAGE THROUGHOUT STRUCTURE WHERE ENTIRE ROOF STRUCTURE AND 2ND FLOOR HAVE COLLAPSED INTO 1ST FLOOR ALONG WITH EXPO#3/4 EXTERIOR WALLS PARTIALLY COLLAPSED DUE TO FIRE.

  • Construction

    Issued Jan 13, 2025 — OWNER TO NYSPE TO SUBMIT REPORT TO ERTINSPECTIONS@BUILDINGS.NYC.GOV WITH IN 72 HOURS ADDRESSING ALL CONDITIONS W/PLANS, PHOTOS, RECOMMENDING TIME FRAME AND REPAIRS TO BE COMPLETED.

  • Low pressure boiler

    Issued Sep 23, 2024 — VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION

  • 15 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 7, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing X01402489-S1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Full Demolition Signed-off.”

    04

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
X01402489-S1
BBL
2023140052
Review type
Professional Certification
Existing stories
2
Proposed stories
Empty in the source
Existing dwelling units
2
Proposed dwelling units
Empty in the source