What the filing says
A public-record reading of the proposed work.
Facade restoration as per design drawings including but not limited to rebuild parapet walls, repointing, glass replacement, lintel repair/replacement, repairs to brick work/masonry/parging, window sealant, shingles, stucco, sill crack, wood gables.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 5-story walk-up apartment building built in 1927, with 716 homes, on a 208,366 sq ft lot.
- Built
- 1927
- Floors
- 5
- Residential units
- 716
- Building type
- Walk-up apartment building
- Land use
- Mixed residential and commercial
- Zoning district
- R7-1
- Lot area
- 208,366 sq ft
- Building area
- 284,920 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 21, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 5 open notices on record for this building, out of 31 notices on file; the most recent was issued Aug 10, 2026.
- Construction
Issued Aug 10, 2026 — FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER AS PER SECTION 28.301.1 OF THE NYC ADMIN CODE. NOTED AT TIME OF INSPECTION COUNTLESS BROKEN WINDOWS AT EXPOSURES 1-4. REMEDY: REPAIR AND/OR REPLACE
- Construction
Issued Oct 17, 2024 — FAILURE TO MAINTAIN BUILDING CODE COMPLIANT MANNER. NOTE: OBSERVED LOOSE/DAMAGED DECORATIVE WOOD AROUND 6TH FLOOR AROUND WINDOW AT EXPOSURE #3 AT EXPOSURE #2 OBSERVED LOOSE DAMAGED WOOD OBSERVED DAMAGE MASONRY SECTORS ON ALL EXPOSURES @ EXPOSURE #3 OBSERVED STEP CRACKS REMEDY: REPAIR AND/OR REPLACE
- Construction
Issued Jun 20, 2024 — FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.NOTE OBSERVED LOOSE/DAMAGED DECORATIVE WOOD AROUND 6TH FL WINDOW AT EXP3 SOUTH ELEV ALSO OBSERVED DETERIORATING MASONRY SECTIONS ON ALL EXP AND OBJECTS ON FIRE ESCAPE AT EXP2 AND 3 EAST,SOUTH ELEV.REMEDY:FIX AND/OR REPLACE
2 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 21, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X01001379-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 83,982 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X01001379-I1
- BIN
- 2093451
- BBL
- 2045060001
- Postal code
- 10467 · 284 filings
- Review type
- Professional Certification
- Existing stories
- 5
- Proposed stories
- 5
- Existing dwelling units
- 736
- Proposed dwelling units
- 736








