What the filing says
A public-record reading of the proposed work.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the NYC building code. no change in use, occupancy, or egress under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story elevator apartment building built in 1929, with 30 homes, on a 5,000 sq ft lot.
- Built
- 1929
- Floors
- 6
- Residential units
- 30
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R7B
- Lot area
- 5,000 sq ft
- Building area
- 25,300 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 15, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 5 open notices on record for this building, out of 44 notices on file; the most recent was issued Mar 28, 2024.
- Construction
Issued Mar 28, 2024 — PARTIAL VACATE ORDER DUE TO MULTIPLE HAZARDOUT CONDITIONS SUCH AS CRAC KED/SPALLING & MISSING BRICK MASONRY.THESE CONDITIONS HAVE MADE THE CO URTYARDS AT EXP#3 EAST AND EXP#4 SOUTH UNABLE TO BE OCCUPIED.REMEDY:VA CATE COURTYARDS AT EXP#3 EAST AND EXP#4 SOUTH.COURTYARDS TO BE USED IN EMERGENCIES ONLY
- Construction
Issued Mar 8, 2024 — .EMERGENCY WORK ORDER 6 STORY + CELLAR FISP BUILDING.OBSERVED @EXPO#3 (EAST ELEV.)FIRE ESCAPE CONNECTION WAS DETERIORATED/CORRODES AT TOP OF PARAPET&@EXP#4(SOUTH ELEV.)FIRE ESCAPE WAS DETACHED AT TOP OF PARAPET WITH CORRODE BRICKS AROUND THE FIRE ESCAPE@TOP OF PARAPET.REMEDYIMMED REPAIR&REPLACEFIRE ESCAPE UNDER SUPERV.OF NYS LIC.PROF.PROV.SAFETY
- Construction
Issued Mar 8, 2024 — .EMERGENCY WORK ORDER 6 STORY + CELLAR FISP BLDGE AT EXP#1(WEST ELEV) (2)BROKEN WIND.SILL@6THFLR DETERIORATEDWIND.LINTEL+SILLS MAJOR CRACKS THROUGHOUT FACADE&AC UNITS OBSTRUCTING FIRE ESCAPE @4TH&6TH FLR @EXP#2 IS LOC.ADJ.TO SCHOOL PLAYGROUND TOGETHER WITH EXPO#3(EAST ELEV.)SEVERE CRACKS THROUGHOUT FACADE.REMEDY:IMMED.NSTALL SIDEWALK SHED@EXP#1
2 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X01414734-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 75,309 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X01414734-I1
- BIN
- 2016377
- BBL
- 2032780007
- Postal code
- 10458 · 239 filings
- Review type
- Professional Certification
- Existing stories
- 6
- Proposed stories
- 6
- Existing dwelling units
- 30
- Proposed dwelling units
- 30








