What the filing says
A public-record reading of the proposed work.
Installation of heavyduty sidewalk shed filed for remedial repairs as per plans. no change in use occupancy or egress under this application. sidewalk shed shall comply with chapter 33 of the 2014 NYC building code.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 10-story condominium built in 2007, with 25 homes, on a 4,560 sq ft lot.
- Built
- 2007
- Floors
- 10
- Residential units
- 25
- Building type
- Condominium
- Land use
- Elevator apartments
- Zoning district
- R6
- Lot area
- 4,560 sq ft
- Building area
- 13,945 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 1, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 1 open notice on record for this building, out of 14 notices on file; the most recent was issued May 21, 2024.
- Construction
Issued May 21, 2024 — FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.AT TIME OF INSPECTION OBSERVED SPALLING BALCONIES AT EXPOSURE #1 OBSERVED SHIFTING BRICK AT 11 FLOOR NEAR BALCONIES. AT EXPOSURE #2 OBSERVED DAMAGED FACADE AROUND 10TH FL AT EXP3 OBSERVED RUSTING BALCOLNIES REMEDY: REPAIR AND/OR REPLACE
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00004992-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded04
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00004992-I1
- BBL
- 3023967501
- Postal code
- 11211 · 3611 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- Empty in the source
- Proposed dwelling units
- Empty in the source