NYC DOB record · B00274919-I1

2765 West 5 Street

2765 West 5 Street, Brooklyn, NY 11224

Alteration filing in Coney Island-Sea Gate, Brooklyn. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 12, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00274919-I1

2765 West 5 Street

Brooklyn, NY 11224

Alteration filing · status dated Jul 13, 2023

Current record
Recorded as completed
Proposed scale
Not stated
Dwelling units
517
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00274919-I1 as a alteration filing at 2765 West 5 Street, Brooklyn, NY 11224. Its latest published status category is Recorded as completed, dated Jul 13, 2023. The filing records 517 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Jul 13, 2023
Proposed scale
517 proposed dwelling units
The building, not the filingopen housing violations, the owner of record and every filing at BIN 3320736Applicant of recordSee the 53 filings that name Stantec
FiledDec 30, 2019
Current recordRecorded as completed
Proposed scale517 units
Recorded cost$10M

What the filing says

A public-record reading of the proposed work.

Mechanical upgrade on 1st-24th floors including new mechanical riser, pump replacement, and new fan coil units. No change in use, egress, or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 24-story elevator apartment building built in 1962, with 1547 homes, on a 539,730 sq ft lot.

Built
1962
Floors
24
Residential units
1547
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R6
Lot area
539,730 sq ft
Building area
1,800,000 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 25, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 5 open notices on record for this building, out of 49 notices on file; the most recent was issued Mar 1, 2024.

  • Construction

    Issued Mar 1, 2024 — PARTIAL VACATE ORD-UNSAFE CONDS @BALCONIES&TERRACE AT EXP1,2,3&4.EXHIB ITING CRACKED/SPALLING CONCR W/EXPOSED REINFORCEMENT&LOOSE CONCRETE @ BALCONY UNDERSIDES.MULTI AREAS OF CRACKS GLASS COMPONENTS @ BALCONY RAILINGS.CONDITIONS MADE ALL BALCONIES & TERRACES @ EXP1,2,3,4. REMEDY VACATE ALL BALCOLNIES AT EXP 1,2,3,4

  • Construction

    Issued Mar 1, 2024 — EMER WRK ORD UNSAFE CONDITIONS @BALCONIES&TERRACE @EXP1,2,3&4.BALCONY HAVE CRACK SPALL SLABS,CRACK&MISSING GLASS RAILING PANES.PARTIAL SIDE WALK SHED HAS BEEN INSTALLED@EXPS.1,3&4,UNSAFE CONDS NOT PROTECTED REMEDY:PROV ADE SAFE MEAS SECURE&PROTECT PUBLIC&INSTALL ADEQU SAFETY MEAS@EXPS.MAKE REPAIRS UNDER THE SUPERV OF REGISTERED PROFESSIONAL

  • Construction

    Issued Mar 1, 2024 — FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT.3/1/24 CRACK/MISSING GLASS BALCONY SLABS @ MULT LOC.REMEDY:RETAIN SVCS OF NYSPE W/GLASS RAILING SYSTEM & CONCRETE BALCONIES TO EXPER TO INSPECT&EVALUATE 100% OF GLASS RAILING SYS @ CONCRETE BALCONIES AT ALL EXPOSURES. PERMIT & FILE ALL WORK.SUBMIT PES REPORT TO FACADES@BUILDINGS@NYC.GOV NO LTR 3/21/24

  • 2 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 22, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00274919-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 74,561 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00274919-I1
BBL
3072530001
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
517
Proposed dwelling units
517
mechanical