NYC DOB record · B01206874-P4

285 North 8 Street

285 North 8 Street, Brooklyn, NY 11211

New building filing in Williamsburg, Brooklyn. The latest DOB status is objections.

The examiner raised objections. The applicant has to resolve them before the filing can be approved. What every status means

Under reviewNew building

NYC Department of Buildings · w9ak-ipjd · accessed Sep 20, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B01206874-P4

285 North 8 Street

Brooklyn, NY 11211

New building · status dated Sep 18, 2026

Current record
Under review
Proposed scale
17 stories
Dwelling units
99
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B01206874-P4 as a new building at 285 North 8 Street, Brooklyn, NY 11211. Its latest published status category is Under review, dated Sep 18, 2026. The filing records 17 proposed stories and 99 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
New building
Latest status
Under review
Latest status date
Sep 18, 2026
Proposed scale
17 proposed stories and 99 proposed dwelling units
The building, not the filingopen housing violations, the owner of record and every filing at BIN 3430509Applicant of recordSee the 26 filings that name Kao Hwa Lee Architects PC
FiledSep 2, 2026
Current recordUnder review
Proposed scale17 stories
Recorded costNot published

What the filing says

A public-record reading of the proposed work.

(please assign to dev hub ) proposing new 17 story and cellar mixed-use building.

Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

Zoning district
M1-2/R6

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 20, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 2 open notices on record for this building, out of 2 notices on file; the most recent was issued May 4, 1998.

  • Local law 62/91 - boilers

    Issued May 4, 1998

  • Local law 62/91 - boilers

    Issued May 4, 1998

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 20, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B01206874-P4.

    01
  2. Current status updated

    The latest recorded filing status is “Objections.”

    02

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B01206874-P4
BBL
3023150133
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
17
Existing dwelling units
Empty in the source
Proposed dwelling units
99
General construction