NYC DOB record · B01434007-I1

285 North 8 Street

285 North 8 Street, Brooklyn, NY 11211

Alteration filing in Williamsburg, Brooklyn. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 1, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B01434007-I1

285 North 8 Street

Brooklyn, NY 11211

Alteration filing · status dated Aug 27, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
99
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B01434007-I1 as a alteration filing at 285 North 8 Street, Brooklyn, NY 11211. Its latest published status category is Approved, dated Aug 27, 2026. The filing records 99 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Aug 27, 2026
Proposed scale
99 proposed dwelling units
The building, not the filingopen housing violations, the owner of record and every filing at BIN 3430509Applicant of recordSee the 120 filings that name Soni Engineering Consulting
FiledJul 23, 2026
Current recordApproved
Proposed scale99 units
Recorded cost$4,000

What the filing says

A public-record reading of the proposed work.

Installation of temporary overhead protection as per plans. no change in use, egress or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

Zoning district
M1-2/R6

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 20, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 2 open notices on record for this building, out of 2 notices on file; the most recent was issued May 4, 1998.

  • Local law 62/91 - boilers

    Issued May 4, 1998

  • Local law 62/91 - boilers

    Issued May 4, 1998

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 20, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B01434007-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Current status updated

    The latest recorded filing status is “Permit Entire.”

    03

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B01434007-I1
BBL
3023150133
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
0
Proposed dwelling units
99