NYC DOB record · B00341701-I1

29 Huron Street

29 Huron Street, Brooklyn, NY 11222

Alteration filing in Greenpoint, Brooklyn. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 21, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00341701-I1

29 Huron Street

Brooklyn, NY 11222

Alteration filing · status dated Apr 3, 2026

Current record
Recorded as completed
Proposed scale
Not stated
Dwelling units
3
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00341701-I1 as a alteration filing at 29 Huron Street, Brooklyn, NY 11222. Its latest published status category is Recorded as completed, dated Apr 3, 2026. The filing records 3 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Apr 3, 2026
Proposed scale
3 proposed dwelling units
The building, not the filingopen housing violations, what it sold for, apartment sizes and every filing at BIN 3428521Applicant of recordSee the 568 filings that name Asif Jamil, RA
FiledApr 16, 2020
Current recordRecorded as completed
Proposed scale3 units
Recorded cost$5,000

What the filing says

A public-record reading of the proposed work.

Installation of construction fence as per plans. construction fence shall comply with chapter #33 of the 2014 code no change to use, egress or occupancy under this application.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

Violation record

Are there open violations here?

The Department of Buildings has 1 open notice on record for this building, out of 3 notices on file; the most recent was issued Aug 24, 2026.

  • Construction

    Issued Aug 24, 2026 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT. OBSERVED THE FOLLOWING CONDITIONS: MISSING PANEL AT 11 FLOOR AT EXPOSURE 2 WEST ELEVATION REMEDY: REPAIR AND/OR REPLACE

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 17, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00341701-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Current status updated

    The latest recorded filing status is “LOC Issued.”

    03
  4. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    04

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,798 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00341701-I1
BBL
Empty in the source
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
3
Proposed dwelling units
3