What the filing says
A public-record reading of the proposed work.
Installation of supported pipe scaffold as indicated on plans. there will be no change in the use, egress, or occupancy under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 14-story elevator apartment building built in 1962, with 2391 homes, on a 1,206,975 sq ft lot.
- Built
- 1962
- Floors
- 14
- Residential units
- 2391
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R7-2
- Lot area
- 1,206,975 sq ft
- Building area
- 2,948,300 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 24, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 24 notices on file; the most recent was issued Jun 20, 2025.
- Construction
Issued Jun 20, 2025 — EMERGENCY WORK ORDER DUE TO CRACKED/SPALLING SLATE COPING STONES AT EXPOSURE #3 EAST ELEVATION AT FIRST FLOOR SETBACK. REMEDY: PROVIDE ADEAUATE SAFETY MEASURES (IE. FENCING/NETTING) UNDER DIRECTION OF LICENSED PROFESSIONAL AT EXPOSURE #3 EAST ELEVATION
- Facade safety program
Issued Oct 28, 2019
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 24, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01359393-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 70,325 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01359393-I1
- BIN
- 1078038
- BBL
- 1003230001
- Postal code
- 10002 · 234 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 132
- Proposed dwelling units
- 132








