NYC DOB record · B01263106-S4

292 Kent Avenue

292 Kent Avenue, Brooklyn, NY 11249

Alteration filing in Williamsburg, Brooklyn. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 13, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B01263106-S4

292 Kent Avenue

Brooklyn, NY 11249

Alteration filing · status dated Sep 11, 2026

Current record
Approved
Proposed scale
14 stories
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B01263106-S4 as a alteration filing at 292 Kent Avenue, Brooklyn, NY 11249. Its latest published status category is Approved, dated Sep 11, 2026. The filing records 14 proposed stories.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Sep 11, 2026
Proposed scale
14 proposed stories
Complete building dossierView all 52 filings associated with BIN 3335796Applicant of recordSee the 59 filings that name Robert Ettinger, P.E, P.C.
FiledJan 15, 2026
Current recordApproved
Proposed scale14 stories
Recorded cost$85,000

What the filing says

A public-record reading of the proposed work.

Sprinkler work for tenant fit-out in retail c + d

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

Violation record

Are there open violations here?

No open violations are recorded for this building. 94 notices are on file, all with a recorded resolution.

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 13, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B01263106-S4.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B01263106-S4
BBL
3024140025
Review type
Professional Certification
Existing stories
14
Proposed stories
14
Existing dwelling units
0
Proposed dwelling units
0