NYC DOB record · B01343384-I1

292 Kent Avenue

292 Kent Avenue, Brooklyn, NY 11249

Alteration filing in Williamsburg, Brooklyn. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Aug 29, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B01343384-I1

292 Kent Avenue

Brooklyn, NY 11249

Alteration filing · status dated Aug 25, 2026

Current record
Approved
Proposed scale
14 stories
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B01343384-I1 as a alteration filing at 292 Kent Avenue, Brooklyn, NY 11249. Its latest published status category is Approved, dated Aug 25, 2026. The filing records 14 proposed stories.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Aug 25, 2026
Proposed scale
14 proposed stories
The building, not the filingopen housing violations, what it sold for, apartment sizes and every filing at BIN 3335796
FiledFeb 4, 2026
Current recordApproved
Proposed scale14 stories
Recorded cost$300,000

What the filing says

A public-record reading of the proposed work.

Structural work for tenant fit-out - retail c

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

Violation record

Are there open violations here?

No open violations are recorded for this building. 94 notices are on file, all with a recorded resolution.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 15, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B01343384-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,798 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B01343384-I1
BBL
3024140025
Review type
Professional Certification
Existing stories
14
Proposed stories
14
Existing dwelling units
0
Proposed dwelling units
0
Structural work