NYC DOB record · B00530746-I1

294 Graham Avenue

294 Graham Avenue, Brooklyn, NY 11211

Alteration filing in East Williamsburg, Brooklyn. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 14, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00530746-I1

294 Graham Avenue

Brooklyn, NY 11211

Alteration filing · status dated Oct 4, 2021

Current record
Recorded as completed
Proposed scale
Not stated
Dwelling units
25
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00530746-I1 as a alteration filing at 294 Graham Avenue, Brooklyn, NY 11211. Its latest published status category is Recorded as completed, dated Oct 4, 2021. The filing records 25 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Oct 4, 2021
Proposed scale
25 proposed dwelling units
The building, not the filingEvery filing at BIN 3069260, with the parcel and violation recordApplicant of recordSee the 327 filings that name Hc Architect, PC
FiledJul 1, 2021
Current recordRecorded as completed
Proposed scale25 units
Recorded cost$2,808

What the filing says

A public-record reading of the proposed work.

Erect illuminated accessory business channel letter wall sign-b, no change to use, egress or occupation

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 4-story condominium built in 1900, with 25 homes, on a 10,000 sq ft lot.

Built
1900
Floors
4
Residential units
25
Building type
Condominium
Land use
Mixed residential and commercial
Zoning district
R6A
Lot area
10,000 sq ft
Building area
35,295 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 14 open notices on record for this building, out of 50 notices on file; the most recent was issued Jul 22, 2026.

  • Construction

    Issued Jul 22, 2026 — FTM BLDG IN A CODE COMPLIANT MANNER-OBSVD AT EXP1 SPALLING CORNICE,2 CRACKED GLASS WINDOWS & A MISSING BRICK AT PARAPET.AT EXP4 OBSVD DETERIORATED MORTAR JOINTS AT CHIMNEY & A DAMAGED/SAGGING WINDOW LINTEL NEAR FIRE ESCAPE. OWNER TO RETAIN NYSPE TO EVAL ENTIRE BLDG, PREPARE FILE REPR DWGS,REPR BLDG UNDER PERMIT,START WORK BY 09/22/26

  • High pressure boiler

    Issued Jun 30, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION

  • High pressure boiler

    Issued Jun 30, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION

  • 11 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00530746-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Current status updated

    The latest recorded filing status is “LOC Issued.”

    03
  4. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    04

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00530746-I1
BBL
3027777502
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
25
Proposed dwelling units
25