What the filing says
A public-record reading of the proposed work.
Modification of sprinkler heads on the 1st floor and new sprinkler heads in the cellar floor. no change in use, egress or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 4-story condominium built in 1900, with 25 homes, on a 10,000 sq ft lot.
- Built
- 1900
- Floors
- 4
- Residential units
- 25
- Building type
- Condominium
- Land use
- Mixed residential and commercial
- Zoning district
- R6A
- Lot area
- 10,000 sq ft
- Building area
- 35,295 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 14 open notices on record for this building, out of 50 notices on file; the most recent was issued Jul 22, 2026.
- Construction
Issued Jul 22, 2026 — FTM BLDG IN A CODE COMPLIANT MANNER-OBSVD AT EXP1 SPALLING CORNICE,2 CRACKED GLASS WINDOWS & A MISSING BRICK AT PARAPET.AT EXP4 OBSVD DETERIORATED MORTAR JOINTS AT CHIMNEY & A DAMAGED/SAGGING WINDOW LINTEL NEAR FIRE ESCAPE. OWNER TO RETAIN NYSPE TO EVAL ENTIRE BLDG, PREPARE FILE REPR DWGS,REPR BLDG UNDER PERMIT,START WORK BY 09/22/26
- High pressure boiler
Issued Jun 30, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION
- High pressure boiler
Issued Jun 30, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION
11 further open notices are on file. Open the source dataset for the full list.
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00210505-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00210505-I1
- BBL
- 3027777502
- Postal code
- 11211 · 2687 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 25
- Proposed dwelling units
- 25








