What the filing says
A public-record reading of the proposed work.
Applicaiton for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 30-story condominium built in 1987, with 92 homes, on a 15,071 sq ft lot.
- Built
- 1987
- Floors
- 30
- Residential units
- 92
- Building type
- Condominium
- Land use
- Mixed residential and commercial
- Zoning district
- C5-1
- Lot area
- 15,071 sq ft
- Building area
- 164,587 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 29, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 48 notices on file; the most recent was issued Jul 31, 2025.
- Construction
Issued Jul 31, 2025 — STRUCTURE RENDERED NON COMPLIANT DUE TO VEHICLE STRIKING SHED. AT TIME OF INSPECTION 1 UPRIGHT POST WAS BENT AND DISPLACED BY A VEHICLE IMPACTING POST.
- Local law 11/98 - facade
Issued Aug 8, 2002
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 29, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01111326-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 88,832 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01111326-I1
- BBL
- 1014967501
- Postal code
- 10028 · 637 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- Empty in the source
- Proposed dwelling units
- Empty in the source








