NYC DOB record · B00520790-I1

30 Skillman Avenue

30 Skillman Avenue, Brooklyn, NY 11211

Alteration filing in East Williamsburg, Brooklyn. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 14, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00520790-I1

30 Skillman Avenue

Brooklyn, NY 11211

Alteration filing · status dated Mar 15, 2022

Current record
Recorded as completed
Proposed scale
Not stated
Dwelling units
1
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00520790-I1 as a alteration filing at 30 Skillman Avenue, Brooklyn, NY 11211. Its latest published status category is Recorded as completed, dated Mar 15, 2022. The filing records 1 proposed dwelling unit.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Mar 15, 2022
Proposed scale
1 proposed dwelling unit
The building, not the filingwhat it sold for, apartment sizes, the owner of record and every filing at BIN 3068493Applicant of recordSee the 33 filings that name Times Buildings Engineering Service
FiledMay 31, 2021
Current recordRecorded as completed
Proposed scale1 units
Recorded cost$1,000

What the filing says

A public-record reading of the proposed work.

Installation plywood fence in conjunction with demo job#322094390 AND #322094407.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

Violation record

Are there open violations here?

No open violations are recorded for this building.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00520790-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 71,086 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00520790-I1
BBL
3027510019
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
1
Proposed dwelling units
1
fence