NYC DOB record · M01432352-I1

300 Cherry Street

300 Cherry Street, Manhattan, NY 10002

Alteration filing in Chinatown-Two Bridges, Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Nov 25, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01432352-I1

300 Cherry Street

Manhattan, NY 10002

Alteration filing · status dated Nov 23, 2026

Current record
Approved
Proposed scale
16 stories
Dwelling units
124
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01432352-I1 as a alteration filing at 300 Cherry Street, Manhattan, NY 10002. Its latest published status category is Approved, dated Nov 23, 2026. The filing records 16 proposed stories and 124 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Nov 23, 2026
Proposed scale
16 proposed stories and 124 proposed dwelling units
Applicant of recordSee the 115 filings that name Pace Engineering P.C.
FiledJul 27, 2026
Current recordApproved
Proposed scale16 stories
Recorded cost$1.3M

What the filing says

A public-record reading of the proposed work.

Bulkhead Renovation. No change in use, egress or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 16-story elevator apartment building built in 1954, with 610 homes, on a 294,793 sq ft lot.

Built
1954
Last altered
1989
Floors
16
Residential units
610
Building type
Elevator apartment building
Land use
Mixed residential and commercial
Zoning district
R7-2
Lot area
294,793 sq ft
Building area
527,043 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 25, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01432352-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 23 days of being filed and a quarter take longer than 4 months, measured across 101,127 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01432352-I1
BIN
1077517
BBL
1002560001
Review type
Standard Plan Examination
Existing stories
16
Proposed stories
16
Existing dwelling units
124
Proposed dwelling units
124
General construction