What the filing says
A public-record reading of the proposed work.
Subsequent filing to combination of units 51 b, c and d, and portion of common hall on 51st floor of 301 west 57th street. replacement and installation of new plumbing fixtures as per attached plans. no change in occupancy, use, egress, floor area, volume
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 56-story condominium built in 1987, with 295 homes, on a 10,042 sq ft lot.
- Built
- 1987
- Floors
- 56
- Residential units
- 295
- Building type
- Condominium
- Land use
- Mixed residential and commercial
- Zoning district
- C6-6
- Lot area
- 10,042 sq ft
- Building area
- 257,885 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 12, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 11 open notices on record for this building, out of 55 notices on file; the most recent was issued Mar 24, 2021.
- Elevator
Issued Mar 24, 2021
- Elevator
Issued Mar 24, 2021
- Construction
Issued Nov 3, 2017 — BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED FOR APPLICATION #123 302611. THE PERMIT HOLDER OF RECORD HAS WITHDRAWN FROM THE PROJECT. ST OP ALL WORK, MAKE SITE SAFE, PROVIDE ALL REQUIRED INFORMATION FORTHWIT H
8 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 12, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01068740-P3.
- Current status updated02
The latest recorded filing status is “Plan Examiner Review.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 79,351 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01068740-P3
- BBL
- 1010487503
- Postal code
- 10019 · 888 filings
- Review type
- Standard Plan Examination
- Existing stories
- 56
- Proposed stories
- 56
- Existing dwelling units
- 270
- Proposed dwelling units
- 268